Tenant improvements often move on tight schedules, and electrical and HVAC requirements can become expensive surprises when they are addressed too late.
New walls, equipment, lighting, kitchens, server rooms, or occupancy levels can change a space’s power, ventilation, heating, and cooling needs. Early coordination helps ensure the completed space supports the tenant’s actual operations—not just the initial floor plan.
Review These Items Before Construction
- Equipment schedules and dedicated circuit requirements
- Special voltage or electrical requirements
- HVAC capacity and ventilation needs
- Thermostat locations and zoning
- Available panel space and electrical service capacity
- Lighting layouts, controls, and emergency systems
- Pathways for future equipment or technology
Late Changes Can Derail the Project
Skipping early coordination can result in change orders, failed inspections, delayed occupancy, and finished surfaces being reopened for additional wiring or ductwork.
More importantly, undersized systems can leave tenants with tripped breakers, uncomfortable spaces, poor ventilation, or equipment that cannot operate properly. Correcting these problems after construction is typically more expensive and disruptive than identifying them during the planning stage.
Herzog Electric coordinates commercial electrical and HVAC solutions to help property owners and tenants complete build-outs with fewer surprises.